Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.11851/7705
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Crama, Yves | - |
dc.contributor.author | Gültekin, Hakan | - |
dc.date.accessioned | 2021-09-11T15:59:02Z | - |
dc.date.available | 2021-09-11T15:59:02Z | - |
dc.date.issued | 2010 | en_US |
dc.identifier.issn | 1094-6136 | - |
dc.identifier.uri | https://doi.org/10.1007/s10951-008-0096-2 | - |
dc.identifier.uri | https://hdl.handle.net/20.500.11851/7705 | - |
dc.description.abstract | In this study, a two-machine flowshop producing identical parts is considered. Each of the identical parts is assumed to require a number of manufacturing operations, and the machines are assumed to be flexible enough to perform different operations. Due to economical or technological constraints, some specific operations are preassigned to one of the machines. The remaining operations, called flexible operations, can be performed on either one of the machines, so that the same flexible operation can be performed on different machines for different parts. The problem is to determine the assignment of the flexible operations to the machines for each part, with the objective of maximizing the throughput rate. We consider various cases regarding the number of parts to be produced and the capacity of the buffer between the machines. We present solution methods for each variant of the problem. | en_US |
dc.description.sponsorship | Scientific and Technical Research Council of TurkeyTurkiye Bilimsel ve Teknolojik Arastirma Kurumu (TUBITAK) [2219] | en_US |
dc.description.sponsorship | The authors thank two anonymous referees for their constructive comments on an earlier version of this paper. The second author acknowledges the partial support of the Scientific and Technical Research Council of Turkey under grant #2219. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Springer | en_US |
dc.relation.ispartof | Journal of Scheduling | en_US |
dc.rights | info:eu-repo/semantics/closedAccess | en_US |
dc.subject | Flexible manufacturing system | en_US |
dc.subject | Assembly line | en_US |
dc.subject | Flowshop | en_US |
dc.subject | Scheduling | en_US |
dc.subject | High multiplicity | en_US |
dc.title | Throughput Optimization in Two-Machine Flowshops With Flexible Operations | en_US |
dc.type | Article | en_US |
dc.department | Faculties, Faculty of Engineering, Department of Industrial Engineering | en_US |
dc.department | Fakülteler, Mühendislik Fakültesi, Endüstri Mühendisliği Bölümü | tr_TR |
dc.identifier.volume | 13 | en_US |
dc.identifier.issue | 3 | en_US |
dc.identifier.startpage | 227 | en_US |
dc.identifier.endpage | 243 | en_US |
dc.authorid | 0000-0002-5416-3249 | - |
dc.authorid | 0000-0002-7470-4743 | - |
dc.identifier.wos | WOS:000277202900003 | en_US |
dc.identifier.scopus | 2-s2.0-77955924685 | en_US |
dc.institutionauthor | Gültekin, Hakan | - |
dc.identifier.doi | 10.1007/s10951-008-0096-2 | - |
dc.relation.publicationcategory | Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı | en_US |
dc.identifier.scopusquality | Q1 | - |
item.openairetype | Article | - |
item.languageiso639-1 | en | - |
item.grantfulltext | none | - |
item.fulltext | No Fulltext | - |
item.openairecristype | http://purl.org/coar/resource_type/c_18cf | - |
item.cerifentitytype | Publications | - |
crisitem.author.dept | 02.4. Department of Industrial Engineering | - |
Appears in Collections: | Endüstri Mühendisliği Bölümü / Department of Industrial Engineering Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection |
CORE Recommender
SCOPUSTM
Citations
12
checked on Dec 21, 2024
WEB OF SCIENCETM
Citations
14
checked on Dec 21, 2024
Page view(s)
86
checked on Dec 16, 2024
Google ScholarTM
Check
Altmetric
Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.