dc.contributor.advisor | Derinkuyu, Kürşad | - |
dc.contributor.author | Aydın, Fatih | - |
dc.date.accessioned | 2020-05-06T10:50:09Z | |
dc.date.available | 2020-05-06T10:50:09Z | |
dc.date.issued | 2019 | |
dc.identifier.citation | Aydın, F. (2019).Rassal iş süreleri altında öğrenme eğrisi etkili melez akış tipi çizelgeleme. Ankara: TOBB ETÜ Fen Bilimleri Enstitüsü. [Yayınlanmamış yüksek lisans tezi] | tr_TR |
dc.identifier.uri | https://tez.yok.gov.tr/UlusalTezMerkezi/tezSorguSonucYeni.jsp | - |
dc.identifier.uri | https://hdl.handle.net/20.500.11851/3521 | - |
dc.description.abstract | Üretim çizelgeleme ile süreçlerin düzenlenmesi, işlerin nerede ve ne zaman yapılacağının belirlenerek iş akışlarının eniyilenmesi amaçlanmaktadır. Çizelgeleme problemleri üretim alanının özelliklerine göre farklılaşmakta olup seri üretim alanlarında çizelgelemeye karşılık gelen terim akış tipi çizelgelemedir. Bu üretim sistemlerinin zamanla farklılaşması ve belirli kaynakların sayısının artırılması ise melez akış tipi sistemlerini oluşturmaktadır. Ele alınan sistemin bir özelliği de iş atlama olarak adlandırılan parçaların akış üzerindeki her aşamada işlem görme zorunluluğu olmamasıdır. Oluşturulması planlanan çizelge ile toplam parça tamamlanma süresinin enazlanması amaçlanmıştır. Çalışmada melez akış tipi çizelgeleme problemine ek olarak uygulama aşamasında gerçek hayatta karşılaşılabilecek zorluklardan sisteme dahil olan yeni parçaların işlem sürelerinin belirsiz olabilmesi ve benzer parçalar üzerinde edinilen tecrübe ile bu parçaların işlenmesi için gereken sürenin zamanla kısalabilmesi durumları ele alınmıştır. Sistemde işlenmiş parçaların üzerindeki öğrenme etkisi incelenmiş ve ayrıştırılmış, çizelgeleme problemine tabi parçaların iş sürelerinin istatistiksel yöntemler ile tahmini gerçekleştirilmiştir. İş atlamalı melez akış tipi çizelgeleme problemi için bir karma tamsayılı matematiksel model önerilmiştir. Problemin zorluğu sebebi ile belirli bir boyutun üzerinde veri kümeleri için matematiksel model ile etkin çözümler elde edilmesi mümkün olmamıştır. Özellikle ilgili veri kümelerinde kullanılmak üzere genel olarak daha kısa sürede daha iyi olurlu çözümler elde edilmesi hedeflenerek Genetik Boş Makine Zamanı Doldurma Algoritması geliştirilmiştir. Geliştirilen meta sezgisel algoritmada iterasyonlar arası geçişlerde genetik algoritmanın çaprazlama, mutasyon ve seçilim özellikleri kullanılmıştır. Genetik Boş Makine Zamanı Doldurma Algoritması ile eşzamanlı olarak işlerin kendi arasında çizelgelenme sıraları ve birden çok kaynağa sahip aşamalar için işlerin atandığı kaynaklar belirlenmektedir. Bu atamalar ve sıralama doğrultusunda elde edilen çizelgeler bireylere karşılık gelmektedir ve çizelgelerin toplam parça tamamlanma süreleri bireylerin uygunluk değerleri olarak belirlenmektedir. Parça işlem süreleri üzerinde çizelgeleme başlamadan önce ve çizelge üzerinde ilgili parçadan önce işlenmiş benzer parçalara göre öğrenme etkisi göz önüne alınmıştır. Parça işlem sürelerinin tahmin doğruluğu istatistiksel kontrol metotları ile ve tahmin ile elde edilen işlem sürelerinin oluşturduğu çizelgenin gerçek işlem süreleri ile oluşturulan çizelgeye olan uyumu ile netleştirilmiştir. Genetik Boş Makine Zamanı Doldurma Algoritması'nın etkinliği ise matematiksel model ve algoritmadan elde edilen çözümler kıyaslanarak değerlendirilmiştir. | tr_TR |
dc.description.abstract | Production scheduling is optimizing workflows by organizing and determining when and where a certain task will be completed. Scheduling problems can be classified by the type of production environment and scheduling for mass production systems is under the topic of flow shop scheduling. Hybrid flow shop scheduling is a special case in flow shop scheduling where in some steps of the system, production line is modified by increasing the number of resources. In addition to hybridity, it is not mandatory for parts to be processed in every stage of the system. Developing a schedule with the objective of minimizing the sum of parts' completion times is aimed. The real-life difficulties during the application phase are considered to be uncertainty of processing times of the new parts included in the system and the learning effect on processing times and both aspects are included in the problem. Learning effect on previously manufactured parts is analyzed and learning effect is seperated to obtain pure processing times. Processing times for new parts are then calculated from pure processing times with statistical learning methods and learning effect is included later. With the calculated processing times, a mixed integer linear mathematical model for hybrid flow shop scheduling with missing operations is proposed. Because of the size of the problem, it was not possible to obtain effective solutions with mathematical model for data sets above a certain size. The Genetic Timetable Gap Filling Algorithm has been developed with the aim of achieving better feasible solutions in a shorter period of time, especially for using in bigger data sets. In the developed heuristic algorithm; selection, crossover and mutation properties of genetic algorithm are adopted. The Genetic Timetable Gap Filling Algorithm simultaneously determines the order in which the jobs will be scheduled and the resources to which the jobs are assigned. Learning effect on process times is calculated based on parts produced in the past and parts that are scheduled before. The schedules obtained by assignments and rankings correspond to the individuals of the population and the sum of parts' completion times are determined as the fitness values of the individuals. Estimation accuracy of the processing times is clarified by statistical control methods and the similarity of the schedules created by the estimated processing times is examined with the schedules created with actual processing times. The effectiveness of The Genetic Timetable Gap Filling Algorithm is evaluated by comparing the solutions obtained by mathematical model and the algorithm. | en_US |
dc.language.iso | tr | en_US |
dc.publisher | TOBB University of Economics and Technology,Graduate School of Engineering and Science | en_US |
dc.publisher | TOBB ETÜ Fen Bilimleri Enstitüsü | tr_TR |
dc.rights | info:eu-repo/semantics/openAccess | en_US |
dc.subject | Scheduling | en_US |
dc.subject | Hybrid flow shop systems | en_US |
dc.subject | Mathematical programming | en_US |
dc.subject | Genetic algorithm | en_US |
dc.subject | Çizelgeleme | tr_TR |
dc.subject | Melez akış tipi üretim sistemleri | tr_TR |
dc.subject | Matematiksel programlarma | tr_TR |
dc.subject | Genetik algoritma | tr_TR |
dc.title | Rassal İş Süreleri Altında Öğrenme Eğrisi Etkili Melez Akış Tipi Çizelgeleme | en_US |
dc.title.alternative | Hybrid Flow Shop Scheduling With Learning Effect Under Uncertain Process Times | en_US |
dc.type | Master Thesis | en_US |
dc.department | Institutes, Graduate School of Engineering and Science, Industrial Engineering Graduate Programs | en_US |
dc.department | Enstitüler, Fen Bilimleri Enstitüsü, Endüstri Mühendisliği Ana Bilim Dalı | tr_TR |
dc.relation.publicationcategory | Tez | en_US |
item.openairetype | Master Thesis | - |
item.languageiso639-1 | tr | - |
item.grantfulltext | open | - |
item.fulltext | With Fulltext | - |
item.openairecristype | http://purl.org/coar/resource_type/c_18cf | - |
item.cerifentitytype | Publications | - |
Appears in Collections: | Endüstri Mühendisliği Yüksek Lisans Tezleri / Industrial Engineering Master Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
613329 (1).pdf | Fatih Aydın_Tez | 4.09 MB | Adobe PDF | View/Open |
CORE Recommender
Page view(s)
252
checked on Dec 16, 2024
Download(s)
94
checked on Dec 16, 2024
Google ScholarTM
Check