Title: Overhaul Planning and Exchange Scheduling for Maintenance Services With Rotable Inventory and Limited Processing Capacity
Authors: Erkoç, Murat
Ertoğral, Kadir
Keywords: Maintenance planning
Rotable inventory
Full-delay scheduling
Earliness
Aviation
Publisher: Pergamon-Elsevier Science Ltd
Source: Erkoc, M., & Ertogral, K. (2016). Overhaul planning and exchange scheduling for maintenance services with rotable inventory and limited processing capacity. Computers & Industrial Engineering, 98, 30-39.
Abstract: Maintenance, repair and overhauling (MRO) of high cost equipment used in many industries are typically subject to regulations set by local governments or international agencies. For example in the aviation industry, critical equipment must be overhauled at certain intervals for continuing permission of use. As such, the overhaul must be completed by strict deadlines. Since the overhaul is typically a long process, MRO companies may implement exchange programs where they carry so called rotable inventory for exchanging expensive modules that require overhaul so that the equipment can continue its services with minimal interruption. The extracted module is overhauled in a capacitated facility and rotated back to the inventory for a future exchange. Since both the rotable inventory and the overhaul process capacity are limited, it may be necessary to carry out some of the exchanges earlier than their deadlines. Early exchanges results in a decrease in the maintenance cycle time of the equipment, which is not desirable for the equipment user. In this paper, we propose an integer programming model so as to minimize total earliness by generating optimal overhaul start times for rotables on parallel processing lines and exchange timetables for orders. We show that the LP relaxation of the proposed model has the integrality property. We develop a practical exact solution algorithm for the model based on a full-delay scheduling approach with backward allocation. The proposed procedure is demonstrated through both a numerical study and a case study from the airline MRO service industry. (C) 2016 Elsevier Ltd. All rights reserved.
URI: https://doi.org/10.1016/j.cie.2016.05.021
https://hdl.handle.net/20.500.11851/1586
ISSN: 0360-8352
Appears in Collections:Endüstri Mühendisliği Bölümü / Department of Industrial Engineering
Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection
WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection

Show full item record



CORE Recommender

SCOPUSTM   
Citations

11
checked on Dec 21, 2024

WEB OF SCIENCETM
Citations

12
checked on Aug 31, 2024

Page view(s)

98
checked on Dec 16, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.