Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.11851/1586
Title: | Overhaul Planning and Exchange Scheduling for Maintenance Services With Rotable Inventory and Limited Processing Capacity | Authors: | Erkoç, Murat Ertoğral, Kadir |
Keywords: | Maintenance planning Rotable inventory Full-delay scheduling Earliness Aviation |
Publisher: | Pergamon-Elsevier Science Ltd | Source: | Erkoc, M., & Ertogral, K. (2016). Overhaul planning and exchange scheduling for maintenance services with rotable inventory and limited processing capacity. Computers & Industrial Engineering, 98, 30-39. | Abstract: | Maintenance, repair and overhauling (MRO) of high cost equipment used in many industries are typically subject to regulations set by local governments or international agencies. For example in the aviation industry, critical equipment must be overhauled at certain intervals for continuing permission of use. As such, the overhaul must be completed by strict deadlines. Since the overhaul is typically a long process, MRO companies may implement exchange programs where they carry so called rotable inventory for exchanging expensive modules that require overhaul so that the equipment can continue its services with minimal interruption. The extracted module is overhauled in a capacitated facility and rotated back to the inventory for a future exchange. Since both the rotable inventory and the overhaul process capacity are limited, it may be necessary to carry out some of the exchanges earlier than their deadlines. Early exchanges results in a decrease in the maintenance cycle time of the equipment, which is not desirable for the equipment user. In this paper, we propose an integer programming model so as to minimize total earliness by generating optimal overhaul start times for rotables on parallel processing lines and exchange timetables for orders. We show that the LP relaxation of the proposed model has the integrality property. We develop a practical exact solution algorithm for the model based on a full-delay scheduling approach with backward allocation. The proposed procedure is demonstrated through both a numerical study and a case study from the airline MRO service industry. (C) 2016 Elsevier Ltd. All rights reserved. | URI: | https://doi.org/10.1016/j.cie.2016.05.021 https://hdl.handle.net/20.500.11851/1586 |
ISSN: | 0360-8352 |
Appears in Collections: | Endüstri Mühendisliği Bölümü / Department of Industrial Engineering Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection |
Show full item record
CORE Recommender
SCOPUSTM
Citations
11
checked on Dec 21, 2024
WEB OF SCIENCETM
Citations
12
checked on Aug 31, 2024
Page view(s)
98
checked on Dec 16, 2024
Google ScholarTM
Check
Altmetric
Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.