| Issue Date | Title | Author(s) |
61 | 2019 | A fix-and-optimize heuristic for the integrated fleet sizing and replenishment planning problem with predetermined delivery frequencies | Dastjerd, Niousha Karimi; Ertoğral, Kadir |
62 | 2023 | Forecast combination approach with meta-fuzzy functions for forecasting the number of immigrants within the maritime line security project in Turkey | Çevik, Fatma Carman; Gever, Başak; Tak, Nihat; Khaniyev, Tahir |
63 | 2013 | Foreword | Khaniyev, Tahir |
64 | 20-Jan-2016 | A framework for energy reduction in manufacturing process chains (E-MPC) and a case study from the Turkish household appliance industry | Mutlu, Fatma; Fescioğlu Ünver, Nilgün |
65 | 2015 | Havayolları Tamir Bakım Servis Sağlayıcıları İçin Bir Üretim Çizelgeleme Modeli Ve Analizi [Article] | Ertoğral, Kadir ; Erkoç, Murat; Ülker, Doğukan Hazar |
66 | 2017 | Heuristic policies for mobile asset sharing within hospitals | Ersol, Duygu; Fescioğlu, Ünver Nilgün |
67 | 2021 | A Holistic Analysis of Privacy-Aware Smart Grid Demand Response | Kement, Cihan Emre; Gültekin, Hakan ; Tavlı, Bülent |
68 | Jul-2017 | A holistic and structured CPFR roadmap with an application between automotive supplier and its aftermarket customer | Demiray, Alptekin; Akay, Diyar; Tekin, Salih ; Boran, Fatih Emre |
69 | 2021 | Holistic Privacy for Electricity, Water, and Natural Gas Metering in Next Generation Smart Homes | Kement, Cihan Emre; Tavlı, Bülent ; Gültekin, Hakan ; Yanıkömeroğlu, Halim |
70 | 2009 | The Impact of One-Time Energy Costs on Network Lifetime in Wireless Sensor Networks | Bıçakcı, Kemal ; Gültekin, Hakan ; Tavlı, Bülent |
71 | 2022 | An Improved Approximate Dynamic Programming Method for The Integrated Fleet Sizing and Replenishment Planning Problem with Predetermined Delivery Frequencies | Aghazadeh, Duygu; Ertogral, Kadir |
72 | 1-Sep-2018 | Improving post-disaster road network accessibility by strengthening links against failures | Yücel, Eda ; Salman, F. Sibel; Arşık, İdil |
73 | 2020 | Inspection location in capacity-constrained lines | Tekin, Salih ; Andradottir, Sigrun |
74 | Feb-2020 | Integrated performance evaluation method study and performance based department ranking: a case study | Şenel, Uğur Tahsin; Daneshvar Rouyendegh (B. Erdebilli), Babak; Tekin, Salih |
75 | 2019 | An integrated production scheduling and workforce capacity planning model for the maintenance and repair operations in airline industry | Ertoğral, Kadir ; Öztürk, Fatma Sedanur |
76 | Jun-2020 | An integrated solution approach for multi-objective, multi-skill workforce scheduling and routing problems | Çakırgil, Seray; Yücel, Eda ; Kuyzu, Gültekin |
77 | 2019 | Inventory model of type (s, S) under heavy tailed demand with infinite variance | Kamışlık, Aslı Bektaş; Kesemen, Tülay; Khaniyev, Tahir |
78 | 2015 | Investigation of fuzzy inventory model of type (s, S) with Nakagami distributed demands | Türkşen, İsmail Burhan ; Khaniyev, Tahir ; Gökpınar, Fikri |
79 | 2023 | Investigation of Upper Bound for the Ruin Probability by Approximate Methods in a Nonlinear Risk Model with Gamma Claims | Khaniyev, T. ; Gever, B.; Hanalioglu, Z. |
80 | 2023 | Investigation the ergodic distribution of a semi-Markovian inventory model of type (s,S) with intuitive approximation approach | Alakoç, Büşra; Bektaş Kamışlık, Aslı; Kesemen, Tülay; Khaniyev, Tahir |