| Issue Date | Title | Author(s) |
121 | Aug-2016 | Overhaul planning and exchange scheduling for maintenance services with rotable inventory and limited processing capacity | Erkoç, Murat; Ertoğral, Kadir |
122 | 30-Sep-2018 | Öncelik Seviyelerine Sahip Çoklu Yetenek Gerektiren İşler için Ekip Oluşturma, Çizelgeleme ve Rotalama | Bilgin, Gözde Kutayer; Yücel, Eda ; Kuyzu, Gültekin |
123 | Dec-2017 | Pure cycles in two-machine dual-gripper robotic cells | Gültekin, Hakan ; Dalgıç, Özden Onur; Aktürk, M. Selim |
124 | 2024 | Quality driven maintenance policies for a deteriorating system subject to non-self-announcing failures | Bakir, Niyazi Onur; Keleş, Büşra; Tekin, Salih |
125 | 2014 | Radiation Dose Reduction in Thorax CT | Koç, Gizem Gül; Kokangül, Ali; Hanalioğlu, Tahir |
126 | 2021 | Regional Examination of Energy Investments in Turkey Using an Intuitionistic Fuzzy Method | Darende, Pınar; Daneshvar, Rouyendegh (B. Erdebilli), Babak; Khaniyev, Tahir |
127 | 2022 | Relief Aid Provision to En Route Refugees: Multi-Period Mobile Facility Location with Mobile Demand | Bayraktar, O. Baturhan; Günneç, Dilek; Salman, F. Sibel; Yücel, Eda |
128 | Nov-2019 | Resource management optimization for a smart microgrid | Fescioğlu, Ünver, Nilgün ; Barlas, Ayca; Yılmaz, Damla; Demli, Uğur Ozhan; Bulgan, Ali Çağdaş; Karaoğlu, Eren Can; Ataşoy, Tuğrul; Ercin, Özden |
129 | 2015 | RFID in production and service systems: Technology, applications and issues | Fescioğlu, Ünver, Nilgün ; Choi, Sung Hee; Sheen, Dongmok; Kumara, Soundar |
130 | 2023 | Scheduling a dual gripper material handling robot with energy considerations | Gürel, Sinan; Gültekin, Hakan ; Emiroğlu, Nurdan |
131 | 2012 | Scheduling in flowshops with flexible operations: Throughput optimization and benefits of flexibility | Gültekin, Hakan |
132 | 1-Feb-2016 | Scheduling in two-machine robotic cells with a self-buffered robot | Gündoğdu, Emine; Gültekin, Hakan |
133 | 2011 | Self Controlling Tabu Search algorithm for the Quadratic Assignment Problem | Fescioğlu, Ünver, Nilgün ; Kokar, Mieczyslaw M. |
134 | 2020 | A semi-Markovian renewal reward process with ?(g) distributed demand | Kamışlık, Aslı Bektaş; Alakoç, Büşra; Kesemen, Tülay; Khaniyev, Tahir |
135 | Feb-2014 | A sharp bound for the ergodic distribution of an inventory control model under the assumption that demands and inter-arrival times are dependent | Hanalioğlu, Tahir ; Aksop, C. |
136 | 2010 | A simulated annealing heuristic for the dynamic layout problem with budget constraint | Şahin, Ramazan; Ertoğral, Kadir ; Türkbey, Orhan |
137 | 2014 | Sistem Geliştirme Projelerinde Kullanılan Olgunluk Değerlendirme Araçları Üzerine Bir Literatür Araştırması | Babaçoğlu, Sinan; Akgün, İbrahim; Altın Kayhan, Ayşegül |
138 | Jun-2016 | Solving a Second Order Fuzzy Initial Value Problem Using The Heaviside Function | Akın, Ömer ; Khaniyev, Tahir ; Bayeğ, Selami; Türkşen, İ. B. |
139 | Jul-2014 | Some asymptotic results for the semi-Markovian random walk with a special barrier | Aliyev, Rovshan; Kesemen, Tülay; Khaniyev, Tahir |
140 | 2014 | Some possible fuzzy solutions for second order fuzzy initial value problems involving forcing terms | Akın, Ömer ; Khaniyev, Tahir ; Oruc, O.; Türkşen, İsmail Burhan |